www.zhesock.com

Pet Sock OEM Material Options for United States Orders

Pet Sock OEM Material Options for United States Orders

United States buyers should fix pet sock material options before price or ship date. Three supplier pages captured on 23 September 2026 are separate statements, not one bill of materials. Pecpets names cotton, polyester, and fleece for item PA-S2009. Size and color are customized. Max Hosiery, by Hangzhou Zhongzhi Industry Co., Ltd., describes a knitted waterproof dog sock: high-tenacity nylon and spandex outer, microporous waterproof and breathable membrane, bamboo viscose blend inner, and waterproof rubber coverage. The page prints US$1.2-1.80/set and MOQ 500 pairs for this style only. Colourful Pet, Yiwu Colourful Pet Products Co., Ltd., names eco-friendly bamboo fibers, recycled polyester, and high-friction silicone coatings as OEM material directions. It says GRS-certified recycled yarn for its dog socks line is in a pilot, which is not a certified purchase-order lot. These lines are not ZheSock tests and are not a United States legal rule for pet-sock fiber.

Vincent Xi, Editorial Author (https://www.zhesock.com/authors/vincent-xi/), prepared this note from the cited pages. It reports no factory visit, wear trial, or measured outcome. ZheSock supplies wearable socks and hosiery. This manufacturing note is an RFQ method for the pet-sock family, not proof that another factory's material is on a ZheSock line.

Pet sock material options on supplier pages

For Pecpets item PA-S2009, named materials are cotton, polyester, and fleece. Percent by weight, and whether fleece is shell, lining, or a brushed face, was not supplied in this research excerpt. Staple versus filament polyester was not supplied either. Require leg, foot, cuff elastic, and grip-base content before cotton or fleece is treated as a specification.

Recycled yarn stays unproven until the file matches the lot. Pecpets says recycled yarn options are available under Eco-Plus. Polymer, recycled percent, and chain-of-custody scope were not supplied in this research excerpt. Colourful says it is piloting GRS-certified recycled yarn for its dog socks line. On a United States order, accept the claim only with polymer, percent by weight, and a current certificate for the yarn to be knitted.

Colourful's eco-friendly bamboo fibers are a stated direction. Max Hosiery's inner is a bamboo viscose blend, tied on that page to soft handfeel, odor control, and moisture management. Blend partners and viscose percent were not supplied in this research excerpt. Name the fiber and blend partners on the specification.

Use nylon, spandex, and a membrane only on the Max Hosiery waterproof stack. The outer is high-tenacity nylon plus spandex. The core is a microporous membrane described as liquid-proof and vapor-permeable. The page also states waterproof rubber coverage against water, mud, and dirt. Whether those are one layer was not supplied in this research excerpt. Denier, spandex percent, thickness, and hydrostatic head were not supplied. The sock is knitted. Hand linked, fake hand linked, or regular toe linking closes the toe and does not set yarn fineness. Needle count was not supplied, and needle count does not produce yarn fineness. Specify denier or yarn count, and require a note reconciling rubber with the membrane.

Silicone is a grip add-on, not a body fiber. Pecpets states 360-degree silicone patterns and 6 patent designs. Colourful lists 360-degree silicone grip and says each batch gets friction, tension, and colorfastness testing, linking colorfastness to safety if a pet licks the fabric. Durometer, coverage, pattern, method, sample size, and pass values were not supplied in this research excerpt. Do not treat 6 patent designs as a patent number. Specify elastomer and pattern for the United States floor.

Colourful says OEM services include thermal linings for cold climates and lightweight mesh for humid tropical regions. Grams per square meter were not supplied in this research excerpt. For a United States order, name fiber and fabric weight. Climate wording is not the specification. Fujian, Zhejiang, and Yiwu addresses are manufacturing origins, not sales markets.

Construction Trade-Offs for United States Orders

Do not swap the waterproof stack for cotton, polyester, and fleece. Max Hosiery limits that sock to indoor traction and short outdoor use on smooth surfaces, including rain, mud, and wet grass. Extended hikes, hot asphalt, rocky trails, and heavy rain or snow should use purpose-built dog boots, on that page. Approve nylon, spandex, membrane, and bamboo viscose only inside that use. No membrane was named for Pecpets PA-S2009 in this research excerpt.

Do not choose a fiber from a slip line. Pecpets states 83 percent less slipping on hardwood, attributed there to a Tufts University test, and that dog socks are a post-surgery must-have for 62 percent of vets. Report title, year, sample, floor, control, and survey wording were not supplied in this research excerpt. Colourful mentions hardwood, tile, and friction testing, with no coefficient of friction here. Those percents remain Pecpets claims, not traits of cotton, polyester, fleece, bamboo viscose, or a membrane.

Stretch changes coverage, so fit belongs in the material RFQ. Max Hosiery says choose by paw width, not weight. On the chart with dateModified 10 September 2026, XXS sole length is 1.2 in / 3.0 cm, sole width is 1.3 in / 3.3 cm, and reference weight is 2-5 lbs / 1-2.3 kg. Weight is reference only. Paw width should be smaller than sole width. The chart runs through XXXL. Between sizes, choose the smaller size for a snug stretchy fit. Another line says one size up for long-haired dogs. Those rules can conflict, so the RFQ picks one. A short field lists S, M, L, and Plus Size, while the chart lists XXS through XXXL. Pecpets states XXS-XXL for all breeds, with no paw-width table in this excerpt. Require paw length and width in inches or centimeters for each United States size.

Supplier Evidence, Method, and Limits

Numbers above come from the three cited pages, captured on 23 September 2026. HTTP Last-Modified is 23 September 2026 for Pecpets and Colourful. Max Hosiery structured data shows datePublished 14 November 2025 and dateModified 10 September 2026. Those stamps are page versions, not quote validity, price validity, or a test period.

Each figure keeps its supplier, unit, and product. A percent without a method stays a supplier claim. The dollar math below is an example assumption, not a mill price. The pages are supplier statements, not lab files. Certificate PDFs, knit-downs, and United States customs rulings were not in this set. Verify any term not supplied in this research excerpt. Silence in an excerpt does not prove the live page omits a term. No wear result is added here.

Colourful's company-wide figures on that page are: founded in 1998, 28 years in pet products, listed in China in 2022, more than 30,000 product items, 8 main factories, 300,000 square meters, a 90-plus R&D team, and more than 1,700 professionals. That is not fiber content or yield for one pet-sock lot.

Buyer Decision Table

Basis: 23 September 2026 capture. Action: United States manufacturing RFQ.

Material decisionStated basis and scopeBuyer action before approvalDo not treat as established
Cotton, polyester, fleecePecpets item PA-S2009 names those three materials. Size and color are customized. Blend ratios were not in the excerpt.Require percent by weight for body, cuff, and lining, and state whether fleece is shell or lining.Waterproof performance, recycled content, or a certificate for this item.
Recycled yarnPecpets says recycled yarn options are available. Colourful says GRS-certified recycled yarn is being piloted for its dog socks line.Accept it only with polymer, recycled percent, and a current certificate covering the shipped yarn.That a pilot or a company list covers this purchase order.
Three-layer waterproof stackMax Hosiery names a nylon plus spandex outer, a microporous membrane, a bamboo viscose blend inner, and waterproof rubber coverage.Specify each layer, the join, and whether rubber and the membrane are one layer. Limit use to indoor traction and short outdoor use.Denier, thickness, hydrostatic head, or use on long hikes and hot asphalt.
Bamboo viscose versus bamboo fiberMax names a bamboo viscose blend inner. Colourful names eco-friendly bamboo fibers as a direction.Name the fiber and blend partners on the specification.A shared percent or a shared process.
Silicone gripPecpets cites 360-degree silicone and 6 patent designs. Colourful cites 360-degree silicone and batch friction, tension, and colorfastness checks.Specify chemistry, pattern, method, and the result for the United States floor.A friction coefficient, a verified patent, or grip from the body yarn.
Thermal lining or meshColourful describes thermal linings for cold climates and lightweight mesh for humid tropical regions, with no fabric weight in the excerpt.Set fiber and grams per square meter for the United States order.Climate wording as a finished specification.
Quoted price and MOQMax Hosiery states US$1.2-1.80/set and MOQ 500 pairs for its waterproof dog sock only.Compare that range only on the same construction, and keep freight and duty out of the goods figure.A market price for other fibers. Pair prices and pair-count MOQs for Pecpets and Colourful were not in the excerpt.
Simpler branding or packPecpets states packs include a sizing guide and care cards, and offers first-order screen printing. Max Hosiery offers Pantone, silicone transfer, a woven label, jacquard, and custom care labels.Approve fewer prints only if fiber content, care text, size, and lot code stay on the label or pack.Pantone, or a shorter print run, as a waiver of fiber disclosure or traceability.

Price and delivery in pet-sock manufacturing

Use US$1.2-1.80/set and MOQ 500 pairs only for the Max Hosiery waterproof style. Incoterm, United States delivery point, and price-validity date were not supplied in this research excerpt. dateModified 10 September 2026 is not a price promise. No numeric Pecpets pet-sock price, and no Colourful pair-count MOQ, was supplied in this research excerpt.

Example calculation, an assumption to verify in the supplier quote, not a landed cost and not a ZheSock price: midpoint of US$1.2-1.80/set is US$1.50 per set. Times the stated 500-pair MOQ, 500 times 1.50 equals US$750 of illustrative goods value for that style only. Confirm one set equals one pair. Freight, duty, brokerage, testing, and print stay outside that goods figure.

Do not turn lead time into order quantity. Pecpets states 30-35 days by sea for a large quantity. Demand in that window is demand exposure, not automatic buffer and not the purchase quantity. Add stock only after usable on-hand units, incoming supply, and committed demand are counted once, without double counting, and after the uncertainty is named.

Do not add Pecpets clocks. The item block says 1-5 days by air for a small quantity and 30-35 days by sea for a large quantity. Other lines say 7-day prototypes, 15-day bulk, and urgent 10-day production. Small, large, and the start event were not defined in this research excerpt. For United States planning, set prototype days after strike-off approval and bulk days after size-set approval, by air or sea, under one Incoterm. Add 15-day bulk to the 30-35 sea days only if the quote says the clocks are sequential.

Labeling, traceability, and unresolved requirements

Separate certificates from legal duties. Colourful's quality block names GRS, OEKO-TEX, ISO9001, FSC, FCCA, SGS, BSCI, and SEDEX. Pecpets states OEKO-TEX and FDA-approved materials. No OEKO-TEX, GRS, or FDA phrase for the Max Hosiery waterproof style was supplied in this research excerpt. A company list is not lot scope. OEKO-TEX and GRS are program names here, not copied lot results. ISO9001 is a management-system name, not a fiber test. This excerpt does not tie FSC to a pet-sock fiber. SGS has no lot-report number. Whether any name is a United States legal duty for a pet sock is unresolved. No chemical threshold or age grade is set here as law.

FDA-approved is Pecpets' wording. The excerpts show no FDA product code and no pet-sock regulation, so product and market applicability stay unresolved. This note does not class the sock as a drug, device, or food-contact article and does not adopt that wording as law. Fiber-label rules, state chemical laws, and the United States customs heading are not settled here. Counsel or a broker should confirm entry and label text before print.

If branding is simplified, keep traceability. Fiber names, percentages, lot code, and care text still have to match the build. Pecpets says packs include a sizing guide and care cards and offers first-order free screen printing. Max Hosiery offers silicone transfer, a woven label, jacquard, custom care labels, and any Pantone number. Pantone is color only. Fewer prints do not drop fiber disclosure, care, size, or lot code. Colourful's friction, tension, and colorfastness checks have no method, sample size, or pass value in this excerpt. A test name does not prove lick safety.

RFQ Checklist

Captured pages can support a material specification. They do not set a United States landed cost or certify a lot.

Discuss Your Requirements

Review our manufacturing capabilities, then share your specifications for a supplier-fit review.

Sources