ZheSock
Home › B2B Guides › MOQ, CBM & Landed-Cost Calculator

Order Volume, Master Carton CBM & DDP Landed-Cost Estimator

Plan bulk custom athletic, crew, dress, compression, grip & promotional socks procurement with factory-calibrated carton presets, 20GP/40HQ container utilization, FOB-to-DDP unit economics (Reference HS: 6115.95 / 6115.96 / 6115.10), and ISO 2859-1 AQL 2.5 inspection sample sizes. Reviewed by Vincent Xi.

Request Exact FOB / DDP Factory Quote Manufacturing & QC Glossary → WhatsApp Engineering Desk

1. Master Carton CBM, Container Fill & DDP Landed-Cost Estimator

Total Master Cartons-
Total Shipment Volume-
Gross / Air Vol. Weight-
20GP / 40HQ Utilization-
Suggested Freight Mode-
Est. DDP Cost / Unit-
Est. Total Landed Batch-
ISO 2859-1 AQL 2.5 Sample-

Note: Calculations are planning estimates based on standard export corrugated cartons (20GP ~27.5 m³, 40HQ ~67.0 m³). Request an itemized tech-pack quotation from ZheSock for exact packaging dimensions, HS tariff verification, and live FOB/DDP forwarder rates.

2. ZheSock Standard Export Carton & Container Loading Reference

Applicable testing & compliance benchmarks: OEKO-TEX Standard 100, BSCI, GRS/GOTS, Metal-Needle Detection, AQL 2.5.

Product ConfigurationPcs / CartonCarton Dimensions & CBMGross WtEst. 20GP FCLEst. 40HQ FCL
168N Combed Cotton Cushioned Athletic Crew Sock w/ Rider Tag (200 pairs/ctn)20056×40×38 cm (0.085 m³)14.2 kg~64,600 units~157,400 units
200N Fine-Gauge Mercerized Dress Logo Sock (250 pairs/ctn)25054×38×36 cm (0.074 m³)12.6 kg~93,000 units~226,500 units
144N PVC/Silicone Non-Slip Pilates/Trampoline Grip Sock (200 pairs/ctn)20054×40×38 cm (0.082 m³)14.8 kg~66,800 units~163,200 units

3. ISO 2859-1 (ANSI/ASQ Z1.4) General Inspection Level II Reference Table

Order Lot Size (Units)Sample InspectedCritical Defects (AQL 0)Major Defects (AQL 2.5 Ac/Re)Minor Defects (AQL 4.0 Ac/Re)
151 – 280 pcs32 pcs0 Accept / 1 Reject2 Accept / 3 Reject3 Accept / 4 Reject
281 – 500 pcs50 pcs0 Accept / 1 Reject3 Accept / 4 Reject5 Accept / 6 Reject
501 – 1,200 pcs80 pcs0 Accept / 1 Reject5 Accept / 6 Reject7 Accept / 8 Reject
1,201 – 3,200 pcs125 pcs0 Accept / 1 Reject7 Accept / 8 Reject10 Accept / 11 Reject
3,201 – 10,000 pcs200 pcs0 Accept / 1 Reject10 Accept / 11 Reject14 Accept / 15 Reject
10,001 – 35,000 pcs315 pcs0 Accept / 1 Reject14 Accept / 15 Reject21 Accept / 22 Reject

4. Frequently Asked B2B Costing & Logistics Questions

How do I calculate master carton CBM and 20GP/40HQ capacity for custom athletic, crew, dress, compression, grip & promotional socks?

Multiply master carton Length x Width x Height in centimeters and divide by 1,000,000 to get CBM per carton, then multiply by total cartons (Order Qty / Pcs per Carton). A floor-loaded 20GP holds ~27.5 CBM and a 40HQ holds ~67.0 CBM.

What is the difference between FOB and DDP unit landed cost when importing from ZheSock?

FOB covers manufacturing, custom packaging, and origin export clearance; DDP landed cost adds ocean/air freight, marine insurance, destination customs duties (reference HS 6115.95 / 6115.96 / 6115.10), and local port/delivery charges divided across total units.

How many units are inspected under ISO 2859-1 AQL 2.5 General Inspection Level II?

Sample size scales with total order lot size: 500 pcs inspects 50 units (Accept 3 / Reject 4 major defects at AQL 2.5), 1,500 pcs inspects 125 units (Accept 7 / Reject 8), and 5,000 pcs inspects 200 units (Accept 10 / Reject 11).

When is LCL sea freight more economical than air express for B2B orders?

Once shipment volume exceeds ~1.5 to 2.0 CBM or 250+ kg chargeable weight, LCL consolidated ocean freight typically cuts per-unit freight cost by 55% to 75% compared with air courier.