Tel: +86-132-0571-7266Email: sales@zhesock.comWorldwide Shipping
Get Free Quote

About ZheSock

Your trusted custom sock manufacturing partner in Datang, Zhejiang, the worlds sock capital.

Home » About Us
Our Story

From Local Knitter to Global Sock Partner

Founded in 2008 by Mr. Wang Jian in Datang Town of Zhuji City, ZheSock began as a small workshop with 8 manual knitting machines and a single shared mission: to deliver custom socks at honest factory prices.

Datang produces over 30% of the worlds socks, a region with deep textile heritage. Over 17 years, we have grown into a vertically integrated manufacturer producing 50 million pairs annually across our 12,000 square meter facility, serving over 500 brands in 45+ countries.

What sets ZheSock apart is not just our scale, it is our obsession with quality consistency, our willingness to take on small experimental designs alongside million-pair runs, and our genuine partnership approach with every B2B client.

ZheSock 12,000 sqm custom sock manufacturing facility with computerized knitting machines
Core Values

What Drives Us Every Day

Quality Without Compromise

Every pair undergoes 5-stage inspection. We use only certified yarns, OEKO-TEX Standard 100, GOTS organic, GRS recycled. No shortcuts. Ever.

Partnership Over Transactions

We treat every brand as a long-term partner, not a one-off order. That means transparent pricing, honest lead times, and proactive communication.

Innovation in Tradition

We combine Datangs centuries-old textile know-how with the latest Italian Lonati and Busi machinery to deliver the best of both worlds.

Sustainability First

From bamboo and organic cotton to recycled polyester and biodegradable packaging, we help brands launch eco-conscious sock lines that consumers love.

Speed as a Service

15-day production lead time, 24-hour quote response, 5-day sample turnaround. We respect your launch timelines and retail calendar.

Ethical Manufacturing

BSCI audited, Sedex SMETA 4-pillar certified. Fair wages, safe workspaces, no overtime abuse. Your brand reputation is safe with us.

ZheSock B2B Showroom with Custom Sock Samples Display
Our Facility

12,000 Sqm of Modern Sock Manufacturing

Our facility is organized into specialized zones for maximum efficiency and quality control:

  • Yarn warehouse, climate controlled storage for 80+ tons of premium yarns
  • Knitting hall - 120 Italian Lonati and Busi computerized machines
  • Embroidery zone - 12-head Tajima embroidery units
  • Linking and finishing department, automatic toe-closing machines
  • Dyeing and washing, low water-consumption equipment
  • QC laboratory, colorfastness, pilling, abrasion testing
  • Design studio - 8 senior knit pattern designers and CAD specialists
  • Packaging line, custom hangtags, sleeves, gift boxes
Certifications and Compliance

Globally Recognized Standards

Our certifications are not just plaques on the wall, they are operational standards we live by every single day, audited annually by independent third parties.

  • OEKO-TEX Standard 100 - Tested for harmful substances
  • BSCI - Business Social Compliance Initiative audit
  • Sedex SMETA 4-Pillar - Labor, health, environment, ethics
  • ISO 9001:2015 - Quality management system
  • GRS - Global Recycled Standard for recycled materials
  • GOTS - Global Organic Textile Standard (yarn level)
  • CPSIA / CA Prop 65 - USA toy/children product compliance
  • REACH - EU chemical safety regulation
ZheSock Manufacturing Certifications OEKO-TEX BSCI ISO 9001

Want to Tour Our Factory Virtually?

Schedule a live video walkthrough with our sales team, meet our designers, see machines in action, and inspect product samples in real time.

Book a Virtual Tour