ZheSock
Home › B2B Guides › USA Import Guide

Wholesale Custom Athletic, Crew, Dress, Compression, Grip & Promotional Socks for United States (US) Importers

Factory-direct OEM/ODM export guide for United States (US) wholesalers, retail brands, and distributors covering HS 6115.95 / 6115.96 / 6115.10 customs clearance, lab compliance, palletization, and ocean/air lead times from ZheSock. Reviewed by Vincent Xi.

Request United States FOB / DDP Quote Calculate Carton CBM & Landed Duty → Compare Material Grades →

1. United States (US) Import Specification & Logistics Summary

Product ScopeCustom Athletic, Crew, Dress, Compression, Grip & Promotional Socks (e.g., 168N Combed Cotton Cushioned Athletic Crew Sock w/ Rider Tag (200 pairs/ctn))
Reference HS Heading6115.95 / 6115.96 / 6115.10 — Verify exact 10-digit HTSUS subheading, MFN base duty, and applicable Section 301 tariff rulings with a licensed US customs broker prior to PO finalization.
Regulatory & Lab StandardsOEKO-TEX Standard 100, BSCI, GRS/GOTS, Metal-Needle Detection, AQL 2.5; US CBP HTS classification, FDA / CPSIA / ASTM / FTC labeling compliance, California Prop 65 chemical screening, and FOB vs DDP door-to-door customs brokerage
Major Destination Ports & TransitLos Angeles / Long Beach (14–18 days sea), Seattle/Tacoma (15–19 days), New York/Newark & Savannah (26–32 days via Panama)
Pallet, Barcode & Origin MarkingGMA 48 x 40 in (1219 x 1016 mm) 4-way pallet, UPC-A (12-digit GS1) & Amazon FNSKU carton labels, mandatory 'Made in China' indelible Country of Origin marking (19 USC 1304)
Pre-Shipment Quality GateISO 2859-1 AQL 2.5 Major / 4.0 Minor + carton drop & barcode verification before container sealing

2. United States (US) Wholesale Buyer FAQs

What compliance and testing documents do United States (US) importers require for custom athletic, crew, dress, compression, grip & promotional socks?

Buyers importing into United States (US) typically verify OEKO-TEX Standard 100, BSCI, GRS/GOTS, Metal-Needle Detection, AQL 2.5 alongside regional requirements: US CBP HTS classification, FDA / CPSIA / ASTM / FTC labeling compliance, California Prop 65 chemical screening, and FOB vs DDP door-to-door customs brokerage.

What HS tariff heading and customs rules apply when shipping to United States (US)?

Shipments generally fall under reference heading HS 6115.95 / 6115.96 / 6115.10. Verify exact 10-digit HTSUS subheading, MFN base duty, and applicable Section 301 tariff rulings with a licensed US customs broker prior to PO finalization.

What are the ocean and air transit timelines from China to United States (US)?

Typical port routing covers Los Angeles / Long Beach (14–18 days sea), Seattle/Tacoma (15–19 days), New York/Newark & Savannah (26–32 days via Panama), plus 5–8 business days via DHL/FedEx/air cargo for urgent pre-production samples or split launch stock.

3. Recommended Engineering & Compliance Briefs