Tel: +86-132-0571-7266Email: sales@zhesock.comWorldwide Shipping
Get Free Quote
Manufacturing Guide

Custom Soccer & Football Socks: Maker Guide

Published: 2026-05-31By ZheSock TeamReading time: 5 min
Custom Soccer & Football Socks: Maker Guide

Soccer (football) socks are one of the highest-volume team-sport categories in the world, every club, school and academy from grassroots to pro needs full sets every season, in team colors, often re-ordered as kids grow and socks wear through. The modern game has also split the category in two: the traditional tall team sock, and the cut-down grip sock worn underneath it. For kit suppliers, clubs and sports brands, custom soccer socks are a steady, design-led, repeat line. This guide covers both formats, the construction and branding, and the MOQ and 2026 pricing.

Table of Contents

Two Products: Team Sock + Grip Sock

The modern soccer sock is really two products:

The grip sock uses the same silicone-grip technology as our grip socks and overlaps our team sports socks, but is engineered specifically for boot lock-in. We make both, and the combo sells as a set.

Team-Sock Construction

Grip-Sock Construction

Team Branding via Sublimation

Materials & Sizing

MOQ & 2026 Pricing

FOB / per-pair, custom soccer socks:

QuantityTeam sock (knit/stripe)Sublimated / grip sock
100-500 pairs (MOQ)$0.85-1.60$1.40-2.50
500-2,000 pairs$0.68-1.25$1.10-2.05
2,000-10,000 pairs$0.55-1.00$0.90-1.70

Lead Times

Why ZheSock for Soccer Socks

We manufacture soccer and football socks for kit suppliers, clubs, academies and sports brands worldwide. We offer:

Send your soccer-kit spec - format, colors, crest and sizes, for a sample and tiered pricing within 12 working hours.

Frequently Asked Questions

What is a soccer grip sock and do you make them?

A grip sock is a short, non-slip-soled sock worn inside the team sock (whose foot is often cut off) to lock the foot to the boot, the biggest equipment trend in the modern game. Yes, we make grip socks with internal and external silicone grip, solo or bundled with the team sock.

What is the minimum order for custom soccer socks?

MOQ is 100 pairs per design and color. Knit/stripe team socks run about $0.85-1.60 per pair at MOQ down to $0.55-1.00 at volume; sublimated team socks and grip socks run $1.40-2.50 down to $0.90-1.70, with player numbers at no surcharge within a run.

Can soccer socks match our exact team colors?

Yes, we sublimate full team colors, stripes, crests and sponsor logos edge to edge with exact kit color matching across the whole strip, plus knit-in or sublimated player numbers. Knit-in logos and stripe bands are available for simpler club socks.

Why are soccer socks over-the-calf?

To cover and hold the shin pad in place. The tall ribbed leg with a stay-up top keeps the pad secure and the sock up through a full 90-minute match, with a cushioned footbed and reinforced heel and toe for stud-boot wear.

Do you make youth and kids' soccer socks?

Yes, we produce a full size range from mini/youth through adult, sold in size bands so a club covers every age group, with cotton-rich options for training and youth socks. Youth kit is the highest-repeat segment as players grow each season.

Can you supply team socks and grip socks together?

Yes, the team-sock-plus-grip-sock set is increasingly how clubs buy, so we offer bundle pricing. The team sock can be made footless or pre-cut for players who pair it with a grip sock underneath.

Related Searches
custom soccer socks with logofootball socks manufacturersoccer grip socks bulksublimated soccer socksteam football socks wholesaleyouth soccer socks customover the calf soccer socks

Looking to Launch Your Custom Sock Line?

ZheSock is a Zhejiang-based OEM/ODM sock manufacturer with 17 years of export experience. Free design, low MOQ from 100 pairs, OEKO-TEX certified.

Get Free Quote Now »

Related Articles

Custom Tennis & Pickleball Socks: Maker Guide
Manufacturing Guide2026-05-31

Custom Tennis & Pickleball Socks: Maker Guide

Custom tennis and pickleball socks: cushioned lateral-support knit, blister-proof fit, moisture-wicking, club branding, ...

Read More »
Custom Thigh-High & Over-the-Knee Socks Guide
Manufacturing Guide2026-05-31

Custom Thigh-High & Over-the-Knee Socks Guide

Custom thigh-high and over-the-knee socks: stay-up silicone tops, cotton and knit-fashion styles, color and pattern opti...

Read More »
Custom Restaurant Non-Slip Socks: Maker Guide
Industry2026-05-31

Custom Restaurant Non-Slip Socks: Maker Guide

Custom restaurant and food-service socks: non-slip grip, cushioned all-day comfort, moisture-wicking anti-odor knit, bra...

Read More »
Ready to manufacture these at scale? Explore our dedicated production pages: Football Socks »  ·  Soccer Socks »