Tel: +86-132-0571-7266Email: sales@zhesock.comWorldwide Shipping
Get Free Quote
Manufacturing Guide

Custom Field Hockey & Lacrosse Socks Guide

Published: 2026-06-01By ZheSock TeamReading time: 5 min
Custom Field Hockey & Lacrosse Socks Guide

Field hockey and lacrosse are stick-and-shin-guard team sports that share a sock brief: a tall over-the-calf sock that holds the shin guard in place, takes bold team colors and survives turf and cleated-boot wear. Both are fast-growing school, college and club sports with seasonal kit reorders. For team-kit suppliers and dealers serving these sports, a custom over-the-calf sock is a reliable, design-led line. This guide covers the shared construction, team branding and the MOQ and 2026 pricing for custom field hockey and lacrosse socks.

Table of Contents

One Sock, Two Stick Sports

Custom field hockey and lacrosse socks share a construction because they share a need: a tall sock over a shin guard. They're close cousins of the soccer sock and part of our team sports range, tuned for turf play and the bold color schemes these sports favor.

Construction

Bold Team Branding

Materials & Sizing

MOQ & 2026 Pricing

FOB / per-pair, custom field hockey / lacrosse socks:

QuantityKnit / stripeFull sublimation
100-500 pairs (MOQ)$0.85-1.60$1.40-2.50
500-2,000 pairs$0.66-1.25$1.12-2.05
2,000-10,000 pairs$0.54-1.00$0.92-1.70

Lead Times

Why ZheSock for Field Hockey & Lacrosse Socks

We manufacture over-the-calf socks for field hockey and lacrosse kit suppliers, dealers and schools worldwide. We offer:

Send your team-sock artwork - sport, colors and graphics, for a sample and tiered pricing within 12 working hours.

Frequently Asked Questions

Why do field hockey and lacrosse use the same socks?

Both are stick sports played with a shin guard, so both need a tall over-the-calf sock that holds and covers the guard, stays up during play, and survives turf and cleated-shoe wear. We build both on one construction, tuned with the bold colors these sports favor.

What is the minimum order for custom lacrosse socks?

MOQ is 100 pairs per design and color. Knit/stripe field hockey and lacrosse socks run about $0.85-1.60 per pair at MOQ down to $0.54-1.00 at volume; full-sublimation versions run $1.40-2.50 down to $0.92-1.70, with player numbers at no surcharge within a run.

Can the socks be fully sublimated with team graphics?

Yes, full sublimated graphics with team colors, patterns, logos and numbers edge to edge, which lacrosse especially favors for loud designs. Knit-in logos and stripe bands are available for simpler team socks, all with exact team-color matching.

Are these socks over-the-calf?

Yes, over-the-calf height is essential to hold and cover the shin guard in both sports, with a stay-up ribbed top that doesn't slip during play, a cushioned footbed and reinforced heel and toe for cleat and turf-shoe wear.

Do you make youth field hockey and lacrosse socks?

Yes, a full size range from youth through adult, sold in size bands so a team or school covers every player, with cotton-rich options for youth and training. Both sports are fast-growing at school and club level with seasonal reorders.

Can players layer these with grip socks?

Yes, we offer a footless or pre-cut version of the team sock for players who layer a grip sock underneath for boot lock-in, the same approach used in soccer. The footless option carries no surcharge within a run.

Related Searches
custom field hockey sockslacrosse socks manufacturerfield hockey socks bulksublimated lacrosse socksover the calf field hockey socksyouth lacrosse socksteam field hockey socks wholesale

Looking to Launch Your Custom Sock Line?

ZheSock is a Zhejiang-based OEM/ODM sock manufacturer with 17 years of export experience. Free design, low MOQ from 100 pairs, OEKO-TEX certified.

Get Free Quote Now »

Related Articles

Custom Volleyball Socks: Bulk Maker Guide
Manufacturing Guide2026-06-01

Custom Volleyball Socks: Bulk Maker Guide

Custom volleyball socks: cushioned crew for indoor court, lateral arch support, moisture-wicking knit, team colors and n...

Read More »
Custom Skateboard & Skate Socks: Maker Guide
Manufacturing Guide2026-06-01

Custom Skateboard & Skate Socks: Maker Guide

Custom skate socks: tall cushioned crew, durable knit for board grip and shoe wear, bold streetwear designs, sublimation...

Read More »
Custom Liner Socks for Shoes: OEM Guide for Brands
Manufacturing Guide2026-06-18

Custom Liner Socks for Shoes: OEM Guide for Brands

A practical guide to custom liner socks for retail and sports brands, with yarn options, anti-slip details, sizing, and ...

Read More »
Ready to manufacture these at scale? Explore our dedicated production pages: Field Hockey Socks »  ·  Lacrosse Socks »