Tel: +86-132-0571-7266Email: sales@zhesock.comWorldwide Shipping
Get Free Quote

Custom Sock Quality Control and AQL Inspection Service

Comprehensive sock quality control: in-line, end-line, AQL 2.5 sampling, third-party inspection coordination (SGS, BV, Intertek, TUV).

Home » Services » Sock Quality Control & Inspection
Custom Sock Quality Control and AQL Inspection Service

Sock quality is decided long before the carton is sealed, it starts at yarn intake, continues at every knit machine, peaks at final hand inspection, and ends with third-party AQL validation before shipment. ZheSock operates a four-stage quality system that has kept our customer defect rate below 1.5% for the past five years across 50+ million pairs annually.

Request Free Quote

Our Four-Stage Quality Process

  1. Incoming yarn inspection - every spool tested for tensile strength, color match, and fiber composition against tech pack spec
  2. In-line machine inspection - operators check first pair off each machine, then every 200th pair, against the approved sample
  3. End-line manual inspection - 100% of pairs hand-inspected for knit defects, color uniformity, logo placement, and finishing quality
  4. AQL 2.5 final inspection - statistical sample drawn from the finished bulk and inspected against ISO 2859-1 general level II standards before packaging

AQL 2.5 - What It Actually Means

AQL 2.5 (Acceptable Quality Limit at 2.5%) is the industry-standard sampling level for textile inspection. For a typical 5,000-pair sock order:

Major defects include broken stitches, color mismatch, holes; minor defects include light loose threads, slight knit irregularity; critical defects include sharp objects in the sock, missing pair, mislabeled size.

Third-Party Inspection Coordination

For risk-averse buyers and first-time orders, we strongly recommend independent third-party inspection. We have working relationships with:

We schedule the inspector on your behalf, prepare the bulk for sampling, and provide complete remediation if any defect cluster is found.

Common Defect Categories We Catch

Why ZheSock for QC and Inspection

Ask for our standard QC documentation pack - we will send sample reports and certification copies within 24 hours.

Learn More

Related Articles and Products

More Services

Other Things We Do

OEM Sock Manufacturing

OEM custom sock production from your tech pack: jacquard, embroidery, materials, MOQ 100 pairs, OEKO-TEX certified. Free...

ODM Sock Design

ODM custom sock design: pick from 1,000+ factory base patterns, add your logo and colors. MOQ 100 pairs, sample in 5-7 d...

Private Label Sock Branding

Private label sock branding from scratch. Logo design, packaging, color palette, full brand identity for retail and DTC ...

Custom Sock Packaging

Custom sock packaging: kraft sleeves, hangtags, polybags, magnetic gift boxes, retail boxes, eco-friendly options. In-ho...

Amazon FBA Sock Manufacturing

Amazon FBA-ready sock manufacturing. FNSKU labeling, polybag suffocation warnings, FBA-warehouse direct shipping. MOQ 10...

Ready to Start Your Custom Sock Project?

Talk to our B2B team for a free quote, free design proposal, and 100-pair MOQ trial orders.

Get Free Quote